Thursday, June 6, 2019

Weekly Photos (6/6/19)

6/3/19 - #2 green before double verticutting


6/3/19 - #2 green, first verticut pass @ 1/8"


6/3/19 - #2 green - verticut back down the same pass @ 1/8"


6/3/19 - #2 green - 1/2 green double verticut down and back the same pass


6/3/19 - #2 green after double verticutting and pro force blowing thatch off of the green


6/3/19 - #2 green after verticutting, blowing, and during triplex mow at .115" with buckets


6/3/19 - #3 green before verticutting


6/3/19 - #3 green after verticutting, blowing, and during triplex mow at .115"


6/3/19 - #6 green


6/3/19 - #8 green


6/3/19 - #18 green before verticutting


6/3/19 - #18 green after double verticutting down and back same pass at 1/8"


6/3/19 - #12 green


6/3/19 - #15 green, hopefully coyote poop


6/3/19 - #15 green after double verticutting down and back the same pass at 1/8"


6/3/19 - closeup of green after double verticutting, blowing thatch, and mowing with buckets at .115"


6/4/19 - #7 white tee box surround  - annual ryegrass (checked out)


6/5/19 - #7 white tee box surround - after mowing out annual ryegrass, re-seeding weeping lovegrass, and fertilizing 

6/5/19 - fescue area to the left of #13 fairway - sprayed with barricade.........and monument.  We promoted our spray tech to assistant superintendent.



6/3/19 - left side of #12 rough near fescue - weak area - needs fert and possible aerify

Thursday, May 30, 2019

Weekly Photos (5/30/19)

BEFORE: flagpole by lap pool before renovating for Memorial Day


AFTER: trimming bushes, adding plants and black dye mulch


5/30/19 - #14 green close up


5/30/19 - #14 green


5/30/19 - #18 white tee


5/30/19 - #18 green surround


5/30/19 - right side rough #12


5/30/19 - #12 green surround taken from fairway


5/30/19 - right side #16 fairway 

5/30/19 - approach tie in from #16 green to fairway



5/30/19 - #16 fescue area


5/30/19 - #15 tee, irrigation head troubleshooting


5/30/19 - Chipping green bunker shelled of sand, ready for new liner work

Friday, May 24, 2019

Weekly Photos (5/24/19)

5/19/19 - closeup of greens (13 days after aerification) 


5/24/19 - #2 fairway





5/24/19 - #2 approach



5/24/19 - #7 fairway



5/24/19 - #11 fairway



5/19/19 - busted head #12 green surround



5/23/19 - front right of #1 white tee - re-sod needed



5/23/19 - #6 back blue tee box - re-sod with 419 from shop yard nursery



#13 fescue strip sprayed out with barricade/monument (on accident)



5/24/19 - #13 green recovering from being valved off and continued control box issues- 2nd day hand watered



5/24/19 - #17 bunker shelled and ready for new liner:  non-contaminated sand used in other bunkers (#13, etc.)



chipping green being worked on (adding non-contaminated sand from #17)



5/24/19 - #3 419 sodded tee mowed at .500" for the first time



5/24/19 - #3 white tee mowed at .500" for the first time since we sodded it



#13 control box motherboard that was underwater during flood event



#13 control box station card that was underwater during flood event

Thursday, May 16, 2019

Weekly Photos (5/16/19)

5/13/19 - #2 double verticut 1/8"


5/13/19 - #4 double verticut 1/8"


5/13/19 - #7 double verticut 1/8"


5/16/19 - #15 closeup - 10 days after aerification


5/16/19 - #15 - 10 days after aerification


5/16/19 - #15 - 10 days after aerification


5/13/19 - #6 fairway


#15 tee control box - flooded last week (completely submerged), damage to internal parts and communication parts (motherboard and station cards)


5/16/19 - #14 full circle head - pressure issue, clogged screen


5/16/19 - clogged screen on head, #14 green


texas rat snake (2nd half of it)