Thursday, September 12, 2019

Weekly Photos (9/12/19)

6/7/19 - vandal joyride cart


6/7/19 - #6 blue tee - vandal joyride ride


6/8/19 - screenshot of Arlos security camera Chip set back up.


6/8/19 - one of three sets of tire tracks from the police suv chasing the vandals Sat night.  No damage to #2 green


Upper transfer pump station - both pumps leaking


leaking stem, bad assembly



9/12/19 - box 023 not receiving pressure from hydraulic line, all heads running (fixed)


9/7/19 - #18 green


9/12/19 - #13 green - earthworm castings


9/12/19 - earthworm castings coming off of the greens mower before blowing off

Thursday, September 5, 2019

Weekly Photos (9/5/19)

broken stem from hydraulic valve assembly - most common problem inside the control boxes


baseplates completely rusted off so the support boards detatch


hydraulic pump went out on 8/30/19


bypassing the existing hydraulic line from the valve to the inlet to the control box (#16)


debris caught by filter by ball valve outside of the control box


upper transfer pump seal broken causing one of the pumps to leak water - towel + duct tape



fitting that connects the hydraulic line leading to the control box to the ball valve and hydraulic pipe


clogged screen on the control box side of the ball valve - contaminated hydraulic line


leaking control box 

picture of the valve boxes outside of the control box



leaking stem - control box


8/26/19 - #2 green - topdress gate 4 gear 1, 3/8" tine on 2.0" spacing, depth H


8/26/19 - alternate angle


8/26/19 - #4 green


8/26/19 - double verticutting plugs and sand at 1/8" - #2 green - 1st pass


8/26/19 - after 2nd verticut pass 

8/28/19 - #3 green -  hydraulic leak from Salsco Roller - after charcoal application and flush



8/30/19 - #3 green - after hydraulic leak


9/5/19 - #3 green after hydraulic leak


9/5/19 - #3 green after hydraulic leak


9/5/19 - closeup of hydraulic leak 8 days afterwards


9/3/19 - closeup of greens 8 days after aerification


9/3/19 - sideview of greens 8 days after aerification


9/5/19 - closeup of greens 10 days after aerification


9/5/19 - #9 fairway


8/27/19 - #12 gold tee aerification - 5/8" core on 2.0" spacing, depth H