Thursday, March 28, 2019

Weekly Photos (3/28/19)

3/27/19 - #18 

3/26/19 - #8 green



3/25/19 - closeup of 1/4" pencil tine aerification (before rolling)


3/27/19 - #13 green


3/22/19 - #16 approach - painted lines for fairway mowers (not connecting fairway anymore)


3/27/19 - #7 annual lovegrass wrapped around the back of tee box


3/26/19 - #13 TifGrand tee that got flooded in the winter and silt buildup - thin 


#8 slope in between pond and green - sprayed with roundup - to be prepped and planted with annual rye and lovegrass next week


#18 slope in between pond and #10 tee box - to be planted with lovegrass next week


#17 "weeping lovegrass" area - needs to be sprayed out and replanted


3/26/19 - #13 taken from behind the green and to the right


3/26/19 - #14 fairway coming out of dormancy


#1 native area in front of blue and white tee - there is a rough head deep in the native


#12 tall fescue


3/26/19 - Driving Range Tee


3/26/19 - #5 green closeup

Thursday, March 21, 2019

Weekly Photos (3/21/19)

3/21/19 - #7 green - foliar fert on Weds, Mancozeb (with pigment) today = super green


3/18/19 - topdress gate 2, 2L speeed (#6 green) 

3/18/19 - coco mat drag #6 green after topdress - off types more apparent



3/18/19 - #6 green after coco mat drag


3/19/19 - #4 green before mowing - tire tracks from coco mat drag (3/18) - mutations/off types apparent


3/21/19 - back of #14 green - weak spots from shade


3/21/19 - closeup of weak spots from shade - PG, CG, #1, #10, #17 show similarities


3/21/19 - annual ryegrass germination behind #7 tee


3/21/19 - taken from in front of #7 blue tee


3/21/19 - #7 weeping lovegrass area - arrow pointing towards new spot where we tied into existing spot


3/21/19 - #7 fairway - moved ropes back due to cart traffic wear


3/20/19 - #13/14 fescue area


3/21/19 - #14 new fescue area where we added 2 heads in June of 2018


pro force blowing live oak trees from #16 and #12 fairway


pro force blowing leaves (opposite angle)


"A lit fuse"

Thursday, March 14, 2019

Weekly Photos (3/14/19)

3/9/19 - someone drove over #18 green, then the putting green, then #9 green - no damage


BEFORE:  #17 blue tee tree limb  - Best Tree Care removed on 3/11/19


AFTER:  #17 blue tee after removing tree limb


BEFORE:  #1 blue and white tee complex - vine growing in tree


AFTER:  vines removed


BEFORE:  #4 slope in front of tee box


AFTER:  cedar removal

BEFORE: #4 slope - photo taken from #4 approach


AFTER:  #4 slope - photo taken from #4 approach



BEFORE:  #7 blue tee


AFTER:  #7 blue tee


3/13/19 - #1 green


3/13/19 - #18 green


3/14/19 - #1 blue and white tee complex - curlex matting - annual ryegrass seed germination


native area left of #1 green - prepped for weeping lovegrass


#4 slope in front of tee box - cleaning up and removing woody shrubs


wtf?

Thursday, March 7, 2019

Weekly Photos (3/7/19)

BEFORE:  1/21/19 - #1 blue and white tee complex before cleanup


BEFORE: limb/vine removal #1 blue and white tee complex, before prepping ground and adding seed/landscape mat


AFTER:  3/6/19 - #1 blue and white tee complex after removing debris, rock, old broken cart paths, adding chocolate loam + annual ryegrass and weeping lovegrass seed, Curlex erosion control matting


BEFORE: 1/21/19 - #1 blue and white tee complex before removing plant material, mulch, debris, limbs, etc.


3/5/19 - #1 blue and white tee complex during slope prep


BEFORE: 1/21/19 - debris, vines, limbs, weeds, etc (alternate angle)


BEFORE: #1 blue and white tee complex during soil prep


AFTER:  #1 blue and white tee complex after adding chocolate loam, before adding seed and Curlex


#1 tee box - rock and old broken up cart path removal


BEFORE: slope at #1 tee complex after brush removal, before rock, weed, stump, root removal


#1 tee complex - adding chocolate loam


#1 tee complex after adding chocolate loam and raking - ready for seed and erosion mat


Adding Curlex erosion mat after applying annual ryegrass and weeping lovegrass seed


#1 blue and white tee complex during Curlex erosion control matting process


AFTER:  3/6/19 - ready for germination - still need to add small strip around front of slope (right side)


3/7/19 - #1 blue and white tee complex after project completion


3/7/19 - #7 white tee complex annual ryegrass seed germination after 1 week


3/7/19 - closeup of annual ryegrass seed germination #7 white tee complex


3/6/19 - covered putting green during the cold spell to keep it insulated - pulled off 10:30 am 3/6/19


3/7/19 - #3 green complex


3/7/19 - #2 fairway - mostly dormant


#12 creek - weeping lovegrass plants from hydromulch last year growing on severe slope


3/5/19 - copper pipe on pump near pressure gauge and clay valve broken and leaking