Thursday, May 30, 2019

Weekly Photos (5/30/19)

BEFORE: flagpole by lap pool before renovating for Memorial Day


AFTER: trimming bushes, adding plants and black dye mulch


5/30/19 - #14 green close up


5/30/19 - #14 green


5/30/19 - #18 white tee


5/30/19 - #18 green surround


5/30/19 - right side rough #12


5/30/19 - #12 green surround taken from fairway


5/30/19 - right side #16 fairway 

5/30/19 - approach tie in from #16 green to fairway



5/30/19 - #16 fescue area


5/30/19 - #15 tee, irrigation head troubleshooting


5/30/19 - Chipping green bunker shelled of sand, ready for new liner work

Friday, May 24, 2019

Weekly Photos (5/24/19)

5/19/19 - closeup of greens (13 days after aerification) 


5/24/19 - #2 fairway





5/24/19 - #2 approach



5/24/19 - #7 fairway



5/24/19 - #11 fairway



5/19/19 - busted head #12 green surround



5/23/19 - front right of #1 white tee - re-sod needed



5/23/19 - #6 back blue tee box - re-sod with 419 from shop yard nursery



#13 fescue strip sprayed out with barricade/monument (on accident)



5/24/19 - #13 green recovering from being valved off and continued control box issues- 2nd day hand watered



5/24/19 - #17 bunker shelled and ready for new liner:  non-contaminated sand used in other bunkers (#13, etc.)



chipping green being worked on (adding non-contaminated sand from #17)



5/24/19 - #3 419 sodded tee mowed at .500" for the first time



5/24/19 - #3 white tee mowed at .500" for the first time since we sodded it



#13 control box motherboard that was underwater during flood event



#13 control box station card that was underwater during flood event

Thursday, May 16, 2019

Weekly Photos (5/16/19)

5/13/19 - #2 double verticut 1/8"


5/13/19 - #4 double verticut 1/8"


5/13/19 - #7 double verticut 1/8"


5/16/19 - #15 closeup - 10 days after aerification


5/16/19 - #15 - 10 days after aerification


5/16/19 - #15 - 10 days after aerification


5/13/19 - #6 fairway


#15 tee control box - flooded last week (completely submerged), damage to internal parts and communication parts (motherboard and station cards)


5/16/19 - #14 full circle head - pressure issue, clogged screen


5/16/19 - clogged screen on head, #14 green


texas rat snake (2nd half of it)

Friday, May 10, 2019

Flood Damage Report (5/10/19)

#4 bunker


#4 bunker liner damage


#4 bunker liner damage


#4 bunker (alternate angle)


#17 bunker


#17 bunker


#17 bunker lip damage


#17 bunker


#17 bunker liner damage


#17 bunker

#2 bunker


#2 bunker (alternate angle)



#2 bunker


#3 bunker


#3 bunker


#5 bunker


#7 bunker


#12 bunker


#12 bunker


#12 bunker (closeup)


#13 bunker


#13 bunker (from back)


#13 bunker (washed sand)


#18 bunker


#18 bunker (different angle)


chipping green bunker A


chipping green bunker B

Celebration bermudagrass sod washout (left side #1 rough in landing area)


419 sod - greenside #1


#17 DG StaLok path


#13 decomposed granite cart path extension
#13 missing railing


#11 bridge makeshift plank repair


#11 bridge railing washout


debris buildup upstream of #11 bridge


debris buildup #11 bridge


debris buildup - downstream of bridge

#10 spillway washout


#10 spillway washout