5/19/19 - closeup of greens (13 days after aerification) |
5/24/19 - #2 fairway |
5/24/19 - #2 approach |
5/24/19 - #7 fairway |
5/24/19 - #11 fairway |
5/19/19 - busted head #12 green surround |
5/23/19 - front right of #1 white tee - re-sod needed |
5/23/19 - #6 back blue tee box - re-sod with 419 from shop yard nursery |
#13 fescue strip sprayed out with barricade/monument (on accident) |
5/24/19 - #13 green recovering from being valved off and continued control box issues- 2nd day hand watered |
5/24/19 - #17 bunker shelled and ready for new liner: non-contaminated sand used in other bunkers (#13, etc.) |
chipping green being worked on (adding non-contaminated sand from #17) |
5/24/19 - #3 419 sodded tee mowed at .500" for the first time |
5/24/19 - #3 white tee mowed at .500" for the first time since we sodded it |
#13 control box motherboard that was underwater during flood event |
#13 control box station card that was underwater during flood event |
No comments:
Post a Comment