4/24/19 - 7.73# per 1000 gypsum application in front of 1.3" all day rain storm for natural flush |
4/25/19 - watering in recharge fert app of 14-4-14 (1.08# N per 1000) |
4/25/19 - #5 greens complex |
4/22/19 - left side #1 rough before final prep for Celebration bermuda sod |
4/22/19 - 4,500 sq. ft of Celebration bermuda sod - fell a little short |
4/25/19 - pulled a few strips of Celebration bermuda off of our shop yard nursery |
4/25/19 - left side #1 rough upon completion of Celebration bermuda sod project |
Alternate angle |
4/19/19 - left side #7 white tee complex |
wear from 2 weekend days of traffic after opening the gate on #13 |
#13 fairway - off-color spots are where we sprayed 1.5 oz (high rate) of Battleship III herbicide for woody aster control |
#16 fairway - spots where we sprayed Battleship III for woody aster - need to lessen rate to 1.25 oz/1000 |
New Toy! |
BEFORE: 3/7/19 - #1 back tee complex seed and erosion control mat installation |
AFTER: 4/25/19 - still spotty, but might improve after this past rain event |
BEFORE: 3/7/19 - #1 back tee complex |
AFTER: 4/25/19 - #1 back tee complex |