| BEFORE - 7/2/19 - #1 fairway after pulverizing at .500" - first fairway pulverized, major scalping |
| 7/11/19 - #1 fairway 9 days after aerification/plug pulverizing |
| Closeup of where the scalping still hasn't recovered (from plug pulverizing) |
| 7/8/19 - finally got the topdresser dialed in and settings right |
| 7/8/19 - back of #14 green - irrigation issues, oak tree roots |
| trench line assumed outside of the irrigation lines, according to witching sticks |
| wrong |
| station wires |
| 3 station wires, 1 common |
| ELECTRIC STATION WIRES BURIED 2 INCHES DEEP IN THE COLLAR - WTF |
| 1.5" pipe repair |
| irrigation station wire repaired, spliced, buried |
| The silver lining: we found the drain exiting the green, so we can add a 4-way, knife valve, and start blowing air into the greens drainage (SubAir) |
| post-trenching |
| 7/11/19 - #3 green |
| 7/11/19 - #3 green closeup |
| clippings - still waiting on our 2nd pro force blower motor approval so we can hopefully get caught back up |