Thursday, July 11, 2019

Weekly Photos (7/11/19)


BEFORE - 7/2/19 - #1 fairway after pulverizing at .500"  - first fairway pulverized, major scalping

7/11/19 - #1 fairway 9 days after aerification/plug pulverizing

Closeup of where the scalping still hasn't recovered (from plug pulverizing)

7/8/19 - finally got the topdresser dialed in and settings right

7/8/19 - back of #14 green - irrigation issues, oak tree roots 

trench line assumed outside of the irrigation lines, according to witching sticks

wrong

station wires

3 station wires, 1 common

ELECTRIC STATION WIRES BURIED 2 INCHES DEEP IN THE COLLAR - WTF

1.5" pipe repair

irrigation station wire repaired, spliced, buried

The silver lining:  we found the drain exiting the green, so we can add a 4-way, knife valve, and start blowing air into the greens drainage (SubAir)

post-trenching

7/11/19 - #3 green

7/11/19 - #3 green closeup

clippings - still waiting on our 2nd pro force blower motor approval so we can hopefully get caught back up