Thursday, March 14, 2019

Weekly Photos (3/14/19)

3/9/19 - someone drove over #18 green, then the putting green, then #9 green - no damage


BEFORE:  #17 blue tee tree limb  - Best Tree Care removed on 3/11/19


AFTER:  #17 blue tee after removing tree limb


BEFORE:  #1 blue and white tee complex - vine growing in tree


AFTER:  vines removed


BEFORE:  #4 slope in front of tee box


AFTER:  cedar removal

BEFORE: #4 slope - photo taken from #4 approach


AFTER:  #4 slope - photo taken from #4 approach



BEFORE:  #7 blue tee


AFTER:  #7 blue tee


3/13/19 - #1 green


3/13/19 - #18 green


3/14/19 - #1 blue and white tee complex - curlex matting - annual ryegrass seed germination


native area left of #1 green - prepped for weeping lovegrass


#4 slope in front of tee box - cleaning up and removing woody shrubs


wtf?

Thursday, March 7, 2019

Weekly Photos (3/7/19)

BEFORE:  1/21/19 - #1 blue and white tee complex before cleanup


BEFORE: limb/vine removal #1 blue and white tee complex, before prepping ground and adding seed/landscape mat


AFTER:  3/6/19 - #1 blue and white tee complex after removing debris, rock, old broken cart paths, adding chocolate loam + annual ryegrass and weeping lovegrass seed, Curlex erosion control matting


BEFORE: 1/21/19 - #1 blue and white tee complex before removing plant material, mulch, debris, limbs, etc.


3/5/19 - #1 blue and white tee complex during slope prep


BEFORE: 1/21/19 - debris, vines, limbs, weeds, etc (alternate angle)


BEFORE: #1 blue and white tee complex during soil prep


AFTER:  #1 blue and white tee complex after adding chocolate loam, before adding seed and Curlex


#1 tee box - rock and old broken up cart path removal


BEFORE: slope at #1 tee complex after brush removal, before rock, weed, stump, root removal


#1 tee complex - adding chocolate loam


#1 tee complex after adding chocolate loam and raking - ready for seed and erosion mat


Adding Curlex erosion mat after applying annual ryegrass and weeping lovegrass seed


#1 blue and white tee complex during Curlex erosion control matting process


AFTER:  3/6/19 - ready for germination - still need to add small strip around front of slope (right side)


3/7/19 - #1 blue and white tee complex after project completion


3/7/19 - #7 white tee complex annual ryegrass seed germination after 1 week


3/7/19 - closeup of annual ryegrass seed germination #7 white tee complex


3/6/19 - covered putting green during the cold spell to keep it insulated - pulled off 10:30 am 3/6/19


3/7/19 - #3 green complex


3/7/19 - #2 fairway - mostly dormant


#12 creek - weeping lovegrass plants from hydromulch last year growing on severe slope


3/5/19 - copper pipe on pump near pressure gauge and clay valve broken and leaking

Friday, March 1, 2019

Weekly Photos (2/28/19)

2/28/19 - #8 green


2/28/19 - #8 green closeup


2/28/19 - putting green:  still managing algae here.  By far the worst area on the course


2/28/19 - PG closeup


2/28/19 - #11 green complex


tree trimming left side #15 in new fescue area


fescue area left side of path on #6


2/28/19 - #8 tee complex - right of path very wet due to overseed tee irrigation program - possibly need to put inward firing small heads on an electric valve to keep the grass right of path more healthy


2/28/19 - future weeping lovegrass area in front of red tee #7 - sprayed out 1 time with roundup


2/28/19 - brushy area left of #2 pond mowed with 72" deck mower - before weedeating pond edge


2/28/19 - #1 blue and white tee complex weeping lovegrass prep


#1 blue and white tee complex - before adding seed and Curlex matting


#1 blue and white tee complex


Transfer pump station wall separating from framework - needs a new wall and possibly new studs


closeup of crack at base of transfer pump station wall