| leaking stem in control box |
| leaking body assembly in control box |
| discharge running in control box |
| discharge hose running in control box |
| broken motherboard |
| heads in front of #17 red tee out of adjustment |
| head not rotating right of #9 green |
| BEFORE: #11 bridge railing broken by May flood |
| AFTER: 7/29/19 - #11 bridge railing repair (still need to paint all railing |
| BEFORE: #11 bridge (missing railing, alternate angle) |
| AFTER: 7/29/19 - bridge railing repair |
| 2 loads of Arkansas White, 1 load of pea gravel for bunker renovation |
| old bunker liner from #17 used to backfill flood washout near #10 tee spillway |
| Chipping green bunker after prepped and ready for bunker liner application |
| #17 bunker prepped and ready for bunker liner application |
| #17 bunker with construction fence perimeter |