4/8/19 - #12 green before mowing |
4/10/19 - #12 green - watering in Divanem (15 min) |
4/8/19 - #11 green |
4/10/19 - #1 green |
4/10/19 - #1 close |
4/9/19 - #4 green |
4/10/19 - putting green after watering in Divanem 15 min |
4/10/19 - #5 green - watering in Divanem |
4/10/19 - #3 green watering in Divanem |
4/10/19 - #7 green - poor water pressure when watering in Divanem |
4/10/19 - back of #14 green - still thin from shade, getting better |
BEFORE: 4/4/19 - front of #18 green |
AFTER: 4/10/19 - #18 green recovering - pythium blight |
4/10/19 - back slope of #6 green complex mowed with 4300 |
4/10/19 - #12 gold tee (TifGrand) |
4/10/19: #3 white tee - no sun in back corner in the winter/spring |
4/10/19 - #7 white tee complex - annual ryegrass area |
4/9/19 - #4 from tee box |
#9 fairway - common bermuda in 419 |
woody aster in rough (and fairways) |
4/9/19 - #12 fairway morning after Battleship III application for woody aster |
Catkins from live oak tree, puddle from rain event over the weekend |
Catkins dropped from live oak tree |
4/11/19 - catkins collected in #1 pond |
brand new custom 2' rebar fescue rope stakes, run over after one day on the course |
rebar fescue rope stakes run over and bent after one day on the course |
4/6/19 - clubhouse front lawn |
BEFORE: #1 left side rough landing area project - prep and sod |
BEFORE: #1 rough - backhoe scrape for rock and root removal |
BEFORE: rock removal |
BEFORE: rock removal |
BEFORE: box blade, hand removal of rocks |
No comments:
Post a Comment