| #1 pond in front of green (before vegetation was removed) |
| I used my john boat to remove brush and underwater limbs from the far side of the pond, then loaded them on a workman to haul to our brush pile |
| BEFORE: 12/17/18 - left side of #1 pond before brush removal |
| AFTER: 12/20/18 - left side of #1 pond after brush removal |
| 12/20/18 - creek on #1 after brush and vine removal |
| view from cart path as you cross the concrete culvert |
| #4 creek (other side of the cart path) after brush removal |
| #4 landscape beds after cleaning and adding black dye mulch |
| alternate view of landscape beds #4 from the other side of the weeping lovegrass area |
| 12/20/18 - #4 creek after willow removal (looking back towards tee) |
| 12/20/18 - #4 creek after willow removal |
| 12/20/18 - #1 tee box - need to remove vines from trees on the right side |
| 12/14/18 - #18 blue and white tee box |
No comments:
Post a Comment